When a buyer applies on or after January 4, 2027 for a conventional loan in a condo building that has to go through full project review, Fannie Mae and Freddie Mac will want the association to put at least 15% of its annual budgeted assessment income into replacement reserves. The current floor is 10%. In a neighborhood where most condos sit in towers and large loft conversions, that one budget line now has a direct say in who can buy your unit and on what terms.
Your kitchen, your view and your staging still set the price a buyer wants to pay. The building's paperwork decides whether that buyer can get the loan they planned on. Since August, buildings with more than ten units get a full review on every conventional sale. The river-view one-bedroom and the corner three-bedroom in the same tower pass or fail together.
The date on the loan application controls everything
Both agencies tie their rule changes to the date the loan application was received. They don't use the listing date or the contract date. That means a unit listed in December and placed under contract in January falls under the new reserve standard if the buyer applies on January 4 or later.
| Date | What changes | Source |
|---|---|---|
| Aug. 3, 2026 | Freddie Mac retired Streamlined Review and Fannie Mae retired Limited Review for applications dated on or after this date | Freddie Mac Bulletin 2026-C, Fannie Mae LL-2026-03 |
| Nov. 1, 2026 | Chicago's 2026 short-form exterior wall reports for high-rises were due | Chicago Department of Buildings |
| Dec. 1 | Chicago's annual due date for critical examination reports | Chicago Department of Buildings |
| Jan. 4, 2027 | The 15% minimum reserve allocation applies to applications dated on or after this date | Freddie Mac Bulletin 2026-C, Fannie Mae LL-2026-03 |
The order of these dates matters for tower owners. Chicago's Department of Buildings has owners of high-rise buildings submit condition reports on their exterior walls. Ongoing short-form reports are due November 1, and critical examination reports are due December 1. Fannie Mae has lenders review any structural or mechanical inspection report completed within the past three years. So whatever a building's engineers wrote about its facade this fall becomes part of the file for every buyer who applies after the reserve floor rises.
Ten units is where the rules split
The rule that matters most for River North sits in the waiver provisions. Fannie Mae skips project review for two-to-four-unit projects. It also skips review for five-to-ten-unit projects that aren't part of a larger development or master association. Freddie Mac's Exempt From Review option uses similar lines: two to four units, or five to ten units not part of a Master Association. In May 2026, Freddie Mac went further. It dropped the requirement to check critical repairs and evacuation orders for those exempt five-to-ten-unit projects.
That gives River North two financing tracks running side by side. A ten-unit converted loft building on a side street can close a conventional loan without the agencies reviewing its budget. A tower a block away has to pass Full Review on every sale, with the new reserve math included. Axios Chicago reported that buildings with 10 or fewer units no longer need a formal review, which makes them easier to finance.
For a seller in a small boutique building, that's a real selling point worth putting in the listing. For a seller in a large tower, it means the building's financial health is now part of what's being sold.
What makes a tower ineligible
Fannie Mae's Ineligible Projects guide spells out what lenders look for. A project is ineligible if it needs critical repairs, defined as repairs or replacements that significantly affect safety, soundness, structural integrity, habitability, financial viability or marketability. The guide's examples include:
- Material deficiencies likely to cause a building system to fail within a year
- Water intrusion or leaks
- Advanced deterioration
- Failed mandatory inspections
- Unfunded repairs costing more than $10,000 per unit that are due within 12 months
Fannie Mae also says a project that fails a state, county or other mandatory inspection for structural safety, soundness or habitability is ineligible. It notes that a facade report alone may not show the condition of every structural element. Special assessments get their own review. Lenders must check each current or planned assessment's purpose, approval status, original and outstanding amounts, and expected payoff date. A project stays ineligible if an assessment pays for a critical repair that hasn't been completed. Freddie Mac asks for the same assessment details and the same three-year look at inspection reports.
The reserve rule is also harder to work around than it might look. Fannie Mae allows a reserve-study exception, but only if the budget includes the study's highest recommended reserve allocation. It also prohibits baseline funding, the approach where the reserve balance gets close to zero but never drops below it.
Illinois law lets owners vote reserves down
This is where state law and federal lending rules can work against each other. Illinois requires condo budgets adopted on or after July 1, 1990 to include reasonable reserves. If a building's condominium instruments don't contain their own reserve requirement, the owners can waive all or part of the reserves by a two-thirds vote. The Condominium Property Act requires any waiver to be disclosed in the association's financial statements and highlighted in its answers to buyer document requests.
A vote that kept dues low for years now shows up in front of every lender. CooperatorNews Chicago reported that Chicago-area associations with lean reserves may have to raise dues or borrow to reach the 15% floor. The same report said a non-warrantable building can push buyers toward portfolio or non-agency loans, which come with higher rates and bigger down payments, and that this shrinks the pool of buyers.
That's how the reserve fund turns into a pricing factor. When fewer buyers can finance easily, fewer offers come in.
The 22.1 packet shows where a building stands
Illinois gives buyers a way to see all of this before they commit. Under Section 22.1 of the Condominium Property Act, a resale seller has to get a set of documents from the board and make them available to the buyer on request. The required items include:
- The declaration, bylaws, other condominium instruments, and rules
- A statement of liens and any unpaid assessments on the unit
- A statement of capital expenditures the association expects in the current and next two fiscal years
- The status and amount of the reserve fund, plus any part set aside for a specific project
- The association's statement of financial condition for the latest available fiscal year
- The status of any pending lawsuits or judgments involving the association
- A statement of the insurance coverage the association provides for all unit owners
- A statement that the prior owner's improvements are believed in good faith to comply with the condominium instruments
- The identity and mailing address of the association's principal officer or other designated officer
Items 3 and 4 answer most of what a lender will ask. Capital expenditures planned for the next two years show whether big projects are coming. Reserve status shows whether those projects are already paid for, or likely to become a special assessment. Chicago Agent magazine reported that with Limited Review gone, a building that fails the guidelines can cause financing problems, so buyers, sellers and agents should look at association records early. For a seller, that means requesting the packet before listing rather than waiting for a buyer to ask after a contract is signed.
Owners selling in 2027 should also talk with their board now, according to a Chicago agent quoted by Axios Chicago. The report said the higher reserve requirement could mean higher monthly dues or tighter budgeting so the association doesn't dip into reserves for every big project.
The market these rules arrive in
Citywide in September 2026, Chicago had 633 condo closings, down 5.7% from September 2025, with a median sale price of $375,000, up 6.7%, according to the Illinois REALTORS September report. Fewer sales at higher prices means each buyer counts for more, and a building that cuts some buyers out of conventional financing feels that more.
River North's top end shows the other side. The Real Deal reported that a 6,100-square-foot condo on the 70th floor of One Chicago, 14 W. Superior St., closed for $8 million on Sept. 8, the city's priciest home sale of 2026 at that point. The 69th-floor unit had sold for $7.9 million in mid-August, and the developer recorded 16 condo sales in three months. Chicago Agent magazine reported that only three units were left in September, priced from $2.1 million to $9 million. At most price points, an older tower's resale units compete for the same buyers, and those buyers will be comparing association budgets as well as floor plans.
Quick answers
Does the 15% rule apply to a contract I sign in December? Both agencies tie the rule to the date the loan application was received. If your buyer applies on or after January 4, 2027 for a loan in a building that requires full review, the new reserve standard applies.
My building has eight units. Does any of this apply? Fannie Mae and Freddie Mac exempt five-to-ten-unit projects from review, as long as they aren't part of a larger development or master association.
Can a buyer still purchase in a building that doesn't qualify? CooperatorNews Chicago reported that buyers in non-warrantable buildings may turn to portfolio or non-agency loans, which usually carry higher rates and need larger down payments.
This post is general information, not legal, tax or financial advice. Please confirm how these rules apply to your building and your loan with a real estate attorney or a mortgage lender.
If you plan to sell a River North condo in 2027, Julie Latsko can go through your building's 22.1 packet and reserve position with you before you list. Then the presentation of your home and the paperwork behind it will support the same price. Get a free home valuation and design consultation to start that review.